MarketDesign.ai
← Market Design Monitor
EU Core region · core-region-intraday-flow-based-capacity-validation

RTE deploys flow-based validation process for Core region intraday capacity calculation, replacing ATC method

Implementation
ENERGY MARKETSINTRADAYflow-based capacity calculationcross-border capacity allocationintraday market couplingATC to flow-based methodology transitionCore region capacity calculationIntraday Capacity Calculation Methodology (Core IDCC) under EU CACM Guideline
1Problem identified
2Consultation
3Proposal
4Regulatory review
5Decision
6Implementation
7Go-live
8Market impact
What changed

RTE announced the deployment of a new Flow-Based validation process for intraday cross-border capacity calculation results (Core IDCC) within the Core region, to be put into production on 29 September 2026 with an application date of 30 September 2026, replacing the current ATC-based intraday validation process.

Why it matters

This methodology shift from ATC to Flow-Based validation for intraday capacity calculation directly affects how cross-border transmission capacity is computed and validated for intraday trading in the Core region, potentially changing available capacity levels, price formation dynamics, and operational security processes for TSOs and market participants relying on accurate intraday cross-zonal capacity.

Design impact
Price formation●●○
Cross-border capacity●●●
Liquidity●○○
Operational security●●○
Market participants●○○
Affected markets
Intraday cross-border electricity marketCore region capacity calculation process
Who is affected
RTECore region TSOsIntraday market participantsCross-border tradersNEMOs
MD analysis

Moving from ATC (Available Transfer Capacity) to Flow-Based methodology for intraday validation aligns the intraday timeframe with the flow-based approach already used in day-ahead capacity calculation in the Core region, improving consistency across timeframes under the CACM framework. Flow-based methods typically allow for more granular and network-realistic representation of cross-border constraints, which can increase available capacity and improve price convergence between bidding zones during intraday trading, but also introduces additional complexity in validation processes that TSOs and market participants must adapt to operationally.

Rule / framework

Intraday Capacity Calculation Methodology (Core IDCC) under EU CACM Guideline

Next milestone

Application date for flow-based validation process (replacing ATC) in Core intraday capacity calculation · 30 Sept 2026

Primary sources

RTE · TSO · 2026-09-22

Interconnexions - Région Core - Calcul de capacité infrajournalier (Core IDCC) en méthode Flow-Based

Open primary source ↗
rte-introduction-of-a-new-rte-flow-based-validation-process-starting-business-day-se