MarketDesign.ai
← Market Design Monitor
Poland · pse-wire-technical-standards-v14-1-poland

PSE Publishes Draft WIRE System Technical Standards v14.1 for Consultation, Covering FRR Manual Activation Integration

Consultation
BALANCING MARKETSREAL-TIMEbalancing market integrationfrequency restoration reserve (FRR) manual activationtechnical standards consultationimbalance settlement correctionnon-market redispatchingIRiESP update
1Problem identified
2Consultation
3Proposal
4Regulatory review
5Decision
6Implementation
7Go-live
8Market impact
What changed

PSE published a draft update (version 14.1) to the Technical Standards of the WIRE system on 24 August 2026, incorporating changes required by Change Project No. 6/2026 to the Balancing Conditions (under EU Regulation 2017/2195) to align standards with integration of the Polish balancing market with the European platform for exchanging balancing energy from frequency restoration reserves with manual (non-automatic) activation, and changes from IRiESP update card No. 2, including a new Annex D (documents for PPE-to-POB assignment information exchange used to correct POB imbalance following non-market redispatching by the TSO) and modifications to the RDEW document for POB imbalance correction.

Why it matters

These technical standards govern how balancing data and imbalance correction information are exchanged within Poland's balancing market infrastructure; the update operationalizes Poland's connection to the European mFRR balancing energy exchange platform and formalizes procedures for correcting imbalances arising from TSO non-market redispatching, directly affecting settlement accuracy and market participant obligations.

Design impact
Price formation●○○
Cross-border capacity●●●
Liquidity●○○
Operational security●●●
Market participants●●●
Affected markets
Polish balancing marketEuropean mFRR balancing energy exchange platform
Who is affected
PSE (Polish TSO)Balance Responsible Parties (POB)Balancing service providersMarket participants subject to non-market redispatching corrections
MD analysis

This is an incremental technical-implementation step tied to EU Electricity Balancing Guideline (EBGL) compliance, specifically the mFRR (manual frequency restoration reserve) cross-border exchange requirement under Regulation 2017/2195. The addition of Annex D and RDEW changes signals PSE is building out the data infrastructure needed to properly attribute and correct balance responsible party (POB) imbalances when the TSO applies non-market redispatching—an issue with direct financial consequences for BRPs. Because this is a draft standard undergoing a short (21-day) consultation window, and PSE explicitly flags that further modification is possible pending the broader ongoing public consultation on new Balancing Conditions, the final technical specification remains fluid. This should be tracked as a distinct process from the parallel SOWE v9.0 standards update, given non-overlapping systems, document annexes, and versioning.

Rule / framework

EU Regulation (EU) 2017/2195 (Electricity Balancing Guideline); Polish Balancing Conditions (Warunki Dotyczące Bilansowania); IRiESP (Instrukcja Ruchu i Eksploatacji Sieci Przesyłowej) Update Card No. 2

Next milestone

Primary sources

PSE · TSO · 2026-08-24

Publikacja wersji roboczej Standardów technicznych systemu WIRE wer.14.1

Open primary source ↗
pse-8065497017