MarketDesign.ai
← Market Design Monitor
EU (Core region) · core-idcc-flow-based-methodology-implementation

RTE sets 08 October 2026 go-live for Core IDCC intraday capacity calculation validation to switch from ATC to Flow-Based methodology

Implementation
ENERGY MARKETSINTRADAYFlow-Based capacity calculationIntraday capacity calculation methodologyATC to Flow-Based transitionCross-border capacity validationCore Intraday Capacity Calculation (IDCC) MethodologyEU (Core region)
1Problem identified
2Consultation
3Proposal
4Regulatory review
5Decision
6Implementation
7Go-live
8Market impact
What changed

RTE announced a new deployment date (application date 08 October 2026) for the Flow-Based methodology validation process for intraday capacity calculation (Core IDCC) within the Core region, replacing the current ATC-based intraday validation process.

Why it matters

This transition changes how intraday cross-border capacity is calculated and validated across the Core region, moving from Available Transfer Capacity (ATC) to Flow-Based methodology, which can materially affect the cross-zonal capacity made available to intraday markets and thus intraday price formation and liquidity between Core bidding zones.

Design impact
Price formation●●○
Cross-border capacity●●○
Liquidity●○○
Operational security●○○
Market participants●○○
Affected markets
Core region intraday marketCross-border intraday capacity allocation
Who is affected
TSOs (Core region)Intraday market participantsCross-border traders
MD analysis

The shift from ATC to Flow-Based capacity calculation for intraday timeframes in the Core region represents a structural change in how network constraints are translated into tradable cross-border capacity. Flow-Based methods typically allow more granular representation of network flows and can increase available capacity relative to ATC in some network conditions, potentially improving intraday liquidity and price convergence across Core bidding zones. However, it also introduces additional complexity in capacity validation and coordination among Core TSOs, with implications for operational security processes during the transition period. The announcement is an update to a previously communicated implementation timeline (a 'new date'), indicating this is a rescheduled deployment rather than a first announcement, though the source only supports this single new date as the actionable fact.

Rule / framework

Core Intraday Capacity Calculation (IDCC) Methodology

Next milestone

Go-live of Core IDCC Flow-Based validation process (replacing ATC-based process) · 8 Oct 2026

Primary sources

RTE · TSO · 2026-10-06

Interconnexions - Région Core - Calcul de capacité infrajournalier (Core IDCC) en méthode Flow-Based

Open primary source ↗
rte-interconnexions-region-core-calcul-de-capacite-infrajournalier-core-idcc-en-meth