SEPS confirms Core and Nordic TSOs, together with JAO, launch Flow-Based Long-Term Capacity Calculation and Allocation (LTCC/LTFBA) on SK/CZ, SK/HU and SK/PL borders from 23 November 2026
Go-liveSEPS has announced that the Core and Nordic region transmission system operators, together with the regional capacity calculation coordinators and the Joint Allocation Office (JAO), will switch to a flow-based methodology for allocating long-term cross-border transmission capacity on the SK/CZ, SK/HU and SK/PL profiles. The new Core Flow-Based Long-Term Capacity Calculation (LTCC) goes live on 23 November 2026 and will be used for the first time in the annual long-term transmission rights auction for delivery year 2027. JAO's first Long-Term Flow-Based Allocation (LTFBA) auction for 2027 opens its bidding window on 30 November 2026, to be followed shortly after by a monthly auction for January 2027.
The shift from the previous coordinated net transmission capacity (NTC) based allocation to a flow-based long-term methodology aligns long-term capacity calculation with the flow-based approach already used in day-ahead and intraday markets across the Core region, improving consistency of available capacity signals across market horizons. For traders and suppliers active on the SK/CZ, SK/HU and SK/PL borders, this changes how long-term transmission rights are calculated and auctioned, directly affecting hedging strategies and cross-border capacity valuation ahead of the 2027 delivery year.
This go-live marks a structural shift in long-term capacity allocation methodology for three Slovak interconnector borders, moving them onto the Core flow-based framework that JAO already operates for day-ahead and intraday timeframes. Harmonizing long-term, monthly and shorter-term capacity calculation methodologies is a core objective of the EU Forward Capacity Allocation framework, and this rollout extends that harmonization to annual and monthly long-term transmission rights. Market participants holding or seeking long-term transmission rights on these borders should expect capacity values to reflect network flow constraints rather than simple net transfer capacities, which can alter available capacity volumes and auction clearing outcomes relative to prior years. The tight sequencing—LTCC live on 23 November, annual auction bidding opening 30 November, and a January 2027 monthly auction to follow—indicates an operationally mature rollout rather than a pilot, suggesting other Core/Nordic borders using the same LTCC/LTFBA infrastructure are likely moving in parallel, though this source addresses only the Slovak borders.
EU Forward Capacity Allocation (FCA) Guideline and Core Capacity Calculation Region flow-based methodology
LTCC go-live for Core Flow-Based Long-Term Capacity Calculation · 23 Nov 2026
Primary sources
Zmena spôsobu prideľovania ročných a mesačných cezhraničných kapacít na profiloch SK/CZ, SK/HU a SK/PL
Open primary source ↗