MarketDesign.ai
← Market Design Monitor
Denmark · denmark-afrr-mfrr-extra-auction-methodology

Forsyningstilsynet opens public hearing on Energinet's proposal to add an aFRR extra auction and shift mFRR extra auction timing

Consultation
BALANCING MARKETSMULTI-TIMEFRAMEbalancing capacity procurementauction methodologyextra auctionsdynamic dimensioningaFRRmFRR
1Problem identified
2Consultation
3Proposal
4Regulatory review
5Decision
6Implementation
7Go-live
8Market impact
What changed

Forsyningstilsynet published a consultation on 20 November 2026 covering Energinet's methodology notification (filed 13 October 2026, journal number 26/00404) for extra auctions for automatic frequency restoration reserves (aFRR) and an amended methodology for the existing extra auctions for manual frequency restoration reserves (mFRR). Energinet proposes to introduce a new extra auction option for aFRR, mirroring the one already used for mFRR, and to move the time at which extra auctions are held one hour later than today. Energinet also seeks authority to subsequently change that timing or add further auction windows without needing additional methodology approval. Stakeholders can submit comments to Forsyningstilsynet until Monday 21 December 2026.

Why it matters

The change is intended to support Energinet's move to dynamic dimensioning of aFRR by allowing additional afternoon capacity purchases for both aFRR and mFRR after the day-ahead spot market has cleared, so the TSO can react to unforeseen events occurring between the morning reserve procurement and spot clearing, or to updated forecasts that warrant extra purchases. Granting Energinet standing authority to adjust auction timing and add new auction slots without further methodology approval increases operational flexibility for balancing capacity procurement but reduces the degree of ex-ante regulatory oversight over the specific scheduling of these auctions.

Design impact
Price formation●●○
Cross-border capacity○○○
Liquidity●○○
Operational security●●●
Market participants●○○
Affected markets
aFRR balancing capacity marketmFRR balancing capacity market
Who is affected
EnerginetForsyningstilsynetBalancing service providersSystem operators
MD analysis

This filing modifies the operational architecture of Denmark's balancing capacity procurement rather than the pricing or allocation principles themselves. By adding a dedicated aFRR extra auction alongside the existing mFRR one and relocating the auction window later in the day, Energinet aligns capacity procurement more closely with near-real-time system conditions, which should improve operational security during periods of forecast error or unexpected events between morning procurement and spot clearing. The request for standing authority to alter timing or add new auction slots without further methodology approval is the more consequential design element: it converts a fixed, regulator-approved auction schedule into a parameter Energinet can tune operationally, trading regulatory predictability for operational agility. Under the EU Electricity Balancing Guideline (Regulation 2017/2195) Article 18, Forsyningstilsynet's review will need to weigh whether this flexibility is proportionate given the limited ex-post visibility stakeholders would retain over future schedule changes. The move also reflects the broader trend of extra/intraday-adjacent auctions being layered onto day-ahead-cleared balancing capacity procurement as reserve dimensioning becomes more dynamic.

Rule / framework

EU Regulation 2017/2195 (Electricity Balancing Guideline), Article 18; Danish methodology approval process via Forsyningstilsynet

Next milestone

Forsyningstilsynet consultation deadline for stakeholder comments on Energinet's methodology notification · 21 Dec 2026

Primary sources

Forsyningstilsynet · REGULATOR · 2026-11-20

Høring: Høring af Energinets anmeldelse af metode for ekstraauktioner for aFRR samt ændring af metode for ekstraauktioner for mFRR

Open primary source ↗
forsyningstilsynet-hoering-af-energinets-anmeldelse-af-metode-for-ekstraauktioner-for-afrr-samt-aendring-af-metode-for-ekstraauktioner-for-mfrr