RTE and Enedis launch experimental local flexibility market in South-West France
Go-liveRTE and Enedis opened the 'Portail Flexibilités', operated by EPEX SPOT, on 3 November 2026, marking the live launch of a new experimental local flexibility market. The market's rules entered into force on 1 September 2026 following a CRE (French energy regulator) deliberation. The market covers 10 departments in South-West France (Landes, Pyrénées-Atlantiques, Hautes-Pyrénées, Ariège, Haute-Garonne, Pyrénées-Orientales, Aude, Tarn, Hérault, Gard) and allows RTE and Enedis to publish local flexibility needs (with or without capacity reservation) to which market actors can respond with offers.
This creates a new, geographically bounded local flexibility market mechanism in France, operated jointly by the transmission system operator (RTE) and a distribution system operator (Enedis) via a third-party platform operator (EPEX SPOT). It establishes a template for TSO-DSO coordinated local flexibility procurement that could be extended to other regions if the experiment succeeds, and opens a new revenue stream and participation pathway for flexibility providers (demand response, storage, distributed generation) in the targeted zones.
This event represents the operational go-live of a novel local flexibility market design distinct from established national balancing or capacity mechanisms. Key design features include: (1) joint TSO-DSO need publication, suggesting integrated transmission-distribution flexibility sourcing; (2) optional capacity reservation alongside spot-type offers, implying a hybrid reservation/activation product structure; (3) use of an established market operator (EPEX SPOT) for platform infrastructure, which may ease interoperability with other EPEX-run markets; (4) a tightly scoped geographic pilot (10 departments) that allows controlled testing of local price signals and participation incentives before any broader rollout. The regulatory grounding via a CRE deliberation gives the mechanism formal legal standing distinct from ad hoc pilot programs. Given the specificity of the launch date and regulatory effective date, this is a concrete, trackable implementation event rather than a conceptual proposal; the primary open question for market design observers is whether offer liquidity materializes in this constrained geography and whether the hybrid reservation/activation structure induces participation from smaller flexibility providers.
CRE deliberation (French energy regulatory authority), effective 1 September 2026
—
Primary sources
Ouverture du marché expérimental de flexibilités locales
Open primary source ↗