PSE Confirms Compensation Rights for Wind Farms Curtailed via Non-Market Redispatching on 15 November 2026
ImplementationPSE issued non-market redispatching orders curbing output from grid-connected wind farm installations (Instalacje FW) on 15 November 2026 under Article 9c(7a) of the Polish Energy Law, and confirmed that affected wind farm owners are entitled to financial compensation under Article 13(7) of EU Regulation 2019/943, with compensation calculation rules, application templates and an FAQ process published on PSE's dedicated webpages.
This operationalizes the compensation mechanism for renewable curtailment in Poland, directly affecting wind farm revenue certainty during periods of non-market redispatching, and signals continued reliance on curtailment as a grid-balancing tool amid growing wind penetration and system constraints.
This is a procedural/administrative implementation event rather than a new regulatory design: PSE is applying an existing legal compensation framework (EU Reg 2019/943 Art 13(7), Polish Energy Law Art 9c(7a), and the 2023 Energy Law amendment Art 30(5)-(6)) to a specific curtailment event. The market-design significance lies in the operational transparency around curtailment volumes (published per-quarter-hour by source type and cause) and the standardized compensation request process, which reduces uncertainty for wind farm operators but does not change the underlying balancing or redispatching market structure. It reinforces non-market (administrative) redispatching as the mechanism of choice over market-based flexibility solutions for managing wind oversupply in the Polish system.
EU Regulation 2019/943 Article 13(7); Polish Energy Law Article 9c(7a); Act of 28 July 2023 amending the Energy Law, Article 30(5)-(6); EU Commission Regulation 2017/2195 (Balancing Guideline) Article 18
—
Primary sources
Komunikat dotyczący prawa do rekompensaty za redysponowanie nierynkowe instalacji wiatrowych w dniu 15 listopada 2026