November 2026
9 Nov 2026
Consultation deadline
ARERA consults on final orientations for dispatch service, simplified energy pricing and DSO storage in Italy's non-interconnected island systems (341/2026/R/eel)
Balancing · MULTI-TIMEFRAME Italy Balance Responsible Parties (BRP), Local DSOs (e.g. e-distribuzione, local distributors) +7
10 Nov 2026
Milestone
BNetzA Announces Results of Germany's First Long-Term Capacity Auction Under StromVKG
Capacity · N/A Germany power plant operators, battery storage operators +3
11 Nov 2026
Consultation deadline
Italy North IDCC methodology consultation proceeds unchanged, confirming Jan 2028 Central Europe DA alignment driver
Balancing · INTRADAY Italy TSOs (Italy North CCR), Italy North D-2&ID Project Team +2
11 Nov 2026
Milestone
Zenobe Energy submits BSC Modification P522 to introduce subsidy-adjusted Shadow Bid Price for Balancing Mechanism transparency
Balancing · REAL-TIME United Kingdom Balancing Mechanism Units (BMUs), Subsidised generators +3
11 Nov 2026
Review
BSC Modification P462: GB industry Workgroup advances proposal to strip subsidy distortion from Balancing Mechanism Bid Prices via BSC Section T amendment
Balancing · REAL-TIME United Kingdom Balancing Mechanism Participants, NGESO (System Operator) +3
11 Nov 2026
Go-live
JAO Confirms UA-SK Intraday Auction Platform Live, Publishes Final Bidding Timeline Ahead of 11 November First Auction
Energy · INTRADAY Slovakia Market participants trading on the UA-SK border, JAO (allocation platform) +5
12 Nov 2026
Review
NESO's BSC Modification P502 moves through Assessment Procedure to create Supplier/Aggregator compensation mechanism for ABSVD-driven imbalance adjustments
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +3
12 Nov 2026
Review
Elexon's Dedicated P521 Tracking Page Confirms Full Report Phase Timetable, Resolving Prior Ambiguity on Panel/Authority Dates
Balancing · N/A United Kingdom Licensed Generators, Route-to-market providers +3
12 Nov 2026
Consultation deadline
Core CCR 4th Amendment Fallback Consultation Confirmed, No New Developments
Energy · DAY-AHEAD Belgium, France, Germany, Ireland, Netherlands, Poland, Austria, Czechia, Slovakia, Hungary, Romania, Slovenia, Croatia, Europe-wide / cross-border Core CCR TSOs (50Hertz, Amprion, APG, Creos, ČEPS, EirGrid, ELES, Elia, HOPS, MAVIR, PSE, RTE, SEPS, TenneT GmbH, TenneT BV, Transelectrica, TransnetBW), independent Transmission Capacity Provider (iTCP) +3
12 Nov 2026
Go-live
JAO Confirms UA-SK Intraday Auction Platform Live, Publishes Final Bidding Timeline Ahead of 11 November First Auction
Energy · INTRADAY Slovakia Market participants trading on the UA-SK border, JAO (allocation platform) +5
13 Nov 2026
Regulatory decision
Elexon's Dedicated P521 Tracking Page Confirms Full Report Phase Timetable, Resolving Prior Ambiguity on Panel/Authority Dates
Balancing · N/A United Kingdom Licensed Generators, Route-to-market providers +3
16 Nov 2026
Consultation deadline
European Commission opens feedback on draft decision approving Sweden's unilateral ETS extension to pulp, paper and board installations
Carbon · N/A Europe-wide / cross-border Sweden (Member State), Pulp, paper and board installation operators +2
16 Nov 2026
Go-live
MCCG webinar details SDAC/SIDC operational progress: XBID 5.0 corrective measures, 15-min MTU one-year review, fallback robustness workstreams, storage orders consultation outcomes, and IT architecture assessment
Energy · MULTI-TIMEFRAME Europe-wide / cross-border NEMOs, TSOs +5
17 Nov 2026
Go-live
RTE launches first daily mFRR upward balancing-capacity auction under new RR-RC V6 rules
Balancing · DAY-AHEAD France Balancing service providers (Acteurs d'Ajustement), Aggregators +4
18 Nov 2026
Go-live
JAO publishes NRA-approved 4th amendment to CCR Core Regional Specific Annex of the HAR, adding SEM-FR border and HVDC return rules ahead of 18 Nov 2026 entry into force
Energy · FORWARD Italy, Europe-wide / cross-border TSOs, JAO (single allocation platform) +3
18 Nov 2026
Consultation deadline
Italy North TSOs confirm LTCC methodology consultation timeline and publish supporting documents
Energy · FORWARD Italy Italy North TSOs, Market participants trading cross-border long-term capacity +2
20 Nov 2026
Consultation deadline
Elexon opens CP1653 consultation to cut MSID Pair Allocation lead time from five to one working day
Flexibility · N/A United Kingdom Supplier Volume Allocation Agents, BSC Systems providers +3
24 Nov 2026
Implementation deadline
Nordic TSOs set 24 November 2026 for removal of indivisible-bid attribute in aFRR and mFRR capacity markets
Balancing · MULTI-TIMEFRAME Denmark, Finland, Norway, Sweden Balancing Service Providers (BSPs), Nordic TSOs (Statnett, Svenska kraftnät, Energinet, Fingrid) +2
24 Nov 2026
Implementation deadline
Nordic TSOs to remove 'Indivisible Bids Allowed' attribute, make Minimum Quantity mandatory in aFRR/mFRR capacity markets from 24 November 2026
Balancing · N/A Denmark, Finland, Norway, Sweden Balancing Service Providers (BSPs), Nordic TSOs
24 Nov 2026
Auction
ARERA's Delibera 332/2026/R/eel reconfirmed: €27,000/MWh/year price cap for Italy's second MACSE battery auction (24 Nov 2026)
Capacity · FORWARD Italy Battery storage developers/investors, Terna (TSO) +1
25 Nov 2026
Go-live
Nordic TSOs set 24 November 2026 for removal of indivisible-bid attribute in aFRR and mFRR capacity markets
Balancing · MULTI-TIMEFRAME Denmark, Finland, Norway, Sweden Balancing Service Providers (BSPs), Nordic TSOs (Statnett, Svenska kraftnät, Energinet, Fingrid) +2
25 Nov 2026
Go-live
Nordic TSOs to remove 'Indivisible Bids Allowed' attribute, make Minimum Quantity mandatory in aFRR/mFRR capacity markets from 24 November 2026
Balancing · N/A Denmark, Finland, Norway, Sweden Balancing Service Providers (BSPs), Nordic TSOs
25 Nov 2026
Milestone
MCCG webinar details SDAC/SIDC operational progress: XBID 5.0 corrective measures, 15-min MTU one-year review, fallback robustness workstreams, storage orders consultation outcomes, and IT architecture assessment
Energy · MULTI-TIMEFRAME Europe-wide / cross-border NEMOs, TSOs +5
25 Nov 2026
Go-live
ARERA Approves Digital-Certificate Access for PCE Platform and Updated Terna–GME Convention Ahead of MARI Connection
Balancing · MULTI-TIMEFRAME Italy Terna (TSO), GME (Gestore dei Mercati Energetici / NEMO) +3
30 Nov 2026
Implementation deadline
CRE issues companion favorable opinion (Deliberation 2026-177) detailing acompte invoicing calendar for France's capacity-mechanism cost-allocation tax
Capacity · N/A France RTE, Enedis +2
30 Nov 2026
Milestone
ARERA approves new weighted-combination algorithm for estimating BRP consumption-side exposure under Italy's dispatch Guarantees Regulation
Balancing · REAL-TIME Italy Balance Responsible Parties (BRP), Balancing Service Providers (BSP) +2
December 2026
1 Dec 2026
Implementation deadline
ARERA adopts deliberation 336/2026/R/eel confirming safeguard-service tender rules and TIV amendments for Italy's 2027-2028 biennium
Energy · N/A Italy Safeguard service suppliers (esercenti la salvaguardia), Final customers without a free-market supplier +4
1 Dec 2026
Implementation deadline
PSE Publishes WIRE Technical Standards v14.1 Integrating Polish Balancing Market with European mFRR Platform and Standardizing Non-Market Redispatch Settlement
Balancing · REAL-TIME Poland Balancing Service Providers, Market Operators +3
1 Dec 2026
Milestone
CNMC issues advisory report on first auction convening specific remuneration regime for high-efficiency cogeneration in Spain
Capacity · N/A Spain High-efficiency cogeneration plant operators (gas), Biomass cogeneration operators +5
2 Dec 2026
Milestone
CNMC issues advisory report on first auction convening specific remuneration regime for high-efficiency cogeneration in Spain
Capacity · N/A Spain High-efficiency cogeneration plant operators (gas), Biomass cogeneration operators +5
4 Dec 2026
Milestone
CNMC issues advisory report on first auction convening specific remuneration regime for high-efficiency cogeneration in Spain
Capacity · N/A Spain High-efficiency cogeneration plant operators (gas), Biomass cogeneration operators +5
6 Dec 2026
Consultation deadline
PSE launches public consultation on draft Amendment 7/2026 to Balancing Conditions (WDB)
Balancing · REAL-TIME Poland Balance Responsible Parties, Balancing service providers +2
9 Dec 2026
Consultation deadline
BSC Modification P462: Removal of CfD/RO Subsidy Distortion from Balancing Mechanism Bid Prices Advances Through Assessment Procedure
Balancing · REAL-TIME United Kingdom BSC Parties, Balancing Mechanism Units +4
9 Dec 2026
Consultation deadline
Elexon confirms P462 Workgroup meeting 18 held and full Assessment Procedure timetable through May 2027 unchanged
Balancing · REAL-TIME United Kingdom National Grid ESO (Proposer), Generators receiving CfD support +4
9 Dec 2026
Auction
RTE and Terna announce preliminary Y+1 and Y+2 auctions for FR-IT yearly Long-Term Transmission Rights (Business Years 2027-2028)
Energy · FORWARD FR-IT border interconnector Market participants trading FR-IT cross-border capacity, RTE +2
9 Dec 2026
Auction
Swissgrid and Terna Launch CH-IT Annual LTTR Auctions for 2027 and 2028 via JAO
Energy · FORWARD CH-IT border interconnector Swissgrid, Terna +2
9 Dec 2026
Consultation deadline
BSC Modification P522 Proposes Subsidy-Adjusted Shadow Bid Price for GB Balancing Mechanism Transparency
Balancing · REAL-TIME United Kingdom BMU operators/generators receiving subsidies, NESO (system operator) +3
9 Dec 2026
Consultation deadline
P462 Adds CEPA Cost-Benefit Analysis Phase-Two Addendum, Timetable Still Unchanged Ahead of November-December 2026 Consultation
Balancing · REAL-TIME United Kingdom CfD-supported generators, RO-supported generators +6
9 Dec 2026
Milestone
CNMC issues advisory report on first auction convening specific remuneration regime for high-efficiency cogeneration in Spain
Capacity · N/A Spain High-efficiency cogeneration plant operators (gas), Biomass cogeneration operators +5
10 Dec 2026
Auction
CNMC issues advisory report on first auction convening specific remuneration regime for high-efficiency cogeneration in Spain
Capacity · N/A Spain High-efficiency cogeneration plant operators (gas), Biomass cogeneration operators +5
15 Dec 2026
Go-live
URE Approves Changes No. 5/2026 to Poland's Balancing Conditions (WDB), Effective 15 December 2026
Balancing · REAL-TIME Poland PSE (TSO), Balance Responsible Parties +1
16 Dec 2026
Auction
Swissgrid and Terna Launch CH-IT Annual LTTR Auctions for 2027 and 2028 via JAO
Energy · FORWARD CH-IT border interconnector Swissgrid, Terna +2
18 Dec 2026
Consultation deadline
NESO's BSC Modification P502 moves through Assessment Procedure to create Supplier/Aggregator compensation mechanism for ABSVD-driven imbalance adjustments
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +3
31 Dec 2026
Milestone
TenneT files long-term-solution report under 2026 loop-flow derogation, flags need for 2027 derogation
Energy · DAY-AHEAD Netherlands, Europe-wide / cross-border TSOs (TenneT), National regulatory authorities (ACM) +5
January 2027
1 Jan 2027
Go-live
BNetzA amends EE grid-cost allocation methodology to refine estimation of renewable capacity in third-party downstream networks
Energy · N/A Germany Distribution network operators (Verteilnetzbetreiber), Transmission system operators (Übertragungsnetzbetreiber) +3
1 Jan 2027
Implementation deadline
JAO document reveals fuller NSL rulebook: implicit GB-NO2 short-term coupling detailed alongside explicit long-term FTR-Option auctions, plus 2027 CBAM flow-tariff provision
Capacity · MULTI-TIMEFRAME Norway, United Kingdom National Grid NSL Limited (NGNSL), Statnett +5
1 Jan 2027
Implementation deadline
ARERA adopts deliberation 336/2026/R/eel confirming safeguard-service tender rules and TIV amendments for Italy's 2027-2028 biennium
Energy · N/A Italy Safeguard service suppliers (esercenti la salvaguardia), Final customers without a free-market supplier +4
1 Jan 2027
Go-live
ARERA adopts deliberation 336/2026/R/eel confirming safeguard-service tender rules and TIV amendments for Italy's 2027-2028 biennium
Energy · N/A Italy Safeguard service suppliers (esercenti la salvaguardia), Final customers without a free-market supplier +4
1 Jan 2027
Go-live
BNetzA publishes full Festlegungsentwurf text (BK8-26-001-A): detailed Tenor and Gründe confirm phased revenue-cap treatment, 2028 self-retention start, scope carve-outs and elimination of individual cost-proof
Balancing · MULTI-TIMEFRAME Germany distribution system operators, balance responsible parties +5
1 Jan 2027
Milestone
ARERA Opens Proceeding to Integrate EV Charging Infrastructure with Grid via Chain 2 Channel and CIR Certification
Flexibility · N/A Italy Distribution system operators (DSOs), EV charging infrastructure operators/service providers +4
1 Jan 2027
Milestone
JAO publishes NRA-approved 4th amendment to CCR Core Regional Specific Annex of the HAR, adding SEM-FR border and HVDC return rules ahead of 18 Nov 2026 entry into force
Energy · FORWARD Italy, Europe-wide / cross-border TSOs, JAO (single allocation platform) +3
1 Jan 2027
Go-live
URE sets 2027 Polish RES surcharge (opłata OZE) at 6.40 zł/MWh, down 0.90 zł/MWh
Energy · N/A Poland Electricity consumers, RES generators receiving support +3
7 Jan 2027
Auction
Commission publishes revised 2026 and 2027 EU ETS1 auction calendars with 190.5 million allowances entering the MSR
Carbon · MULTI-TIMEFRAME Ireland, United Kingdom, Europe-wide / cross-border Power generators, Industrial installations +6
7 Jan 2027
Go-live
European Commission publishes revised 2027 EU ETS1 and first-ever 2027 EU ETS2 auction calendars
Carbon · N/A Europe-wide / cross-border ETS1 regulated installations, ETS2 regulated entities (fuel suppliers for buildings/transport) +4
8 Jan 2027
Auction
Commission publishes revised 2026 and 2027 EU ETS1 auction calendars with 190.5 million allowances entering the MSR
Carbon · MULTI-TIMEFRAME Ireland, United Kingdom, Europe-wide / cross-border Power generators, Industrial installations +6
13 Jan 2027
Auction
Commission publishes revised 2026 and 2027 EU ETS1 auction calendars with 190.5 million allowances entering the MSR
Carbon · MULTI-TIMEFRAME Ireland, United Kingdom, Europe-wide / cross-border Power generators, Industrial installations +6
15 Jan 2027
Review
NESO's BSC Modification P502 moves through Assessment Procedure to create Supplier/Aggregator compensation mechanism for ABSVD-driven imbalance adjustments
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +3
15 Jan 2027
Consultation deadline
Zenobe Energy submits BSC Modification P522 to introduce subsidy-adjusted Shadow Bid Price for Balancing Mechanism transparency
Balancing · REAL-TIME United Kingdom Balancing Mechanism Units (BMUs), Subsidised generators +3
15 Jan 2027
Consultation deadline
BSC Modification P462: GB industry Workgroup advances proposal to strip subsidy distortion from Balancing Mechanism Bid Prices via BSC Section T amendment
Balancing · REAL-TIME United Kingdom Balancing Mechanism Participants, NGESO (System Operator) +3
18 Jan 2027
Go-live
European Commission publishes revised 2027 EU ETS1 and first-ever 2027 EU ETS2 auction calendars
Carbon · N/A Europe-wide / cross-border ETS1 regulated installations, ETS2 regulated entities (fuel suppliers for buildings/transport) +4
19 Jan 2027
Regulatory decision
NESO's BSC Modification P502 moves through Assessment Procedure to create Supplier/Aggregator compensation mechanism for ABSVD-driven imbalance adjustments
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +3
21 Jan 2027
Regulatory decision
ACER review of NEMOs’ EU market-algorithm amendment remains underway
Energy · MULTI-TIMEFRAME Europe-wide / cross-border NEMOs, TSOs +1
21 Jan 2027
Regulatory decision
MCCG webinar details SDAC/SIDC operational progress: XBID 5.0 corrective measures, 15-min MTU one-year review, fallback robustness workstreams, storage orders consultation outcomes, and IT architecture assessment
Energy · MULTI-TIMEFRAME Europe-wide / cross-border NEMOs, TSOs +5
27 Jan 2027
Consultation deadline
P502 Timetable Firms Up: Elexon Specifies January 2027 Assessment Procedure Consultation Window
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
February 2027
11 Feb 2027
Regulatory decision
BSC Modification P462: Removal of CfD/RO Subsidy Distortion from Balancing Mechanism Bid Prices Advances Through Assessment Procedure
Balancing · REAL-TIME United Kingdom BSC Parties, Balancing Mechanism Units +4
11 Feb 2027
Review
P510: Fifth Workgroup Meeting Held as Scheduled, Assessment Report Deadline of 11 February 2027 Reaffirmed
Energy · MULTI-TIMEFRAME United Kingdom Virtual Trading Parties, Virtual Lead Parties +3
11 Feb 2027
Review
Elexon confirms P462 Workgroup meeting 18 held and full Assessment Procedure timetable through May 2027 unchanged
Balancing · REAL-TIME United Kingdom National Grid ESO (Proposer), Generators receiving CfD support +4
11 Feb 2027
Review
BSC Modification P522 Proposes Subsidy-Adjusted Shadow Bid Price for GB Balancing Mechanism Transparency
Balancing · REAL-TIME United Kingdom BMU operators/generators receiving subsidies, NESO (system operator) +3
11 Feb 2027
Regulatory decision
Elexon's BSC Modification P510 advances through Assessment Procedure to replace mutualised VTP compensation with direct bidirectional mechanism in GB Wholesale Market
Energy · MULTI-TIMEFRAME United Kingdom Virtual Trading Parties (VTPs), Electricity Suppliers +5
11 Feb 2027
Review
P462 Adds CEPA Cost-Benefit Analysis Phase-Two Addendum, Timetable Still Unchanged Ahead of November-December 2026 Consultation
Balancing · REAL-TIME United Kingdom CfD-supported generators, RO-supported generators +6
11 Feb 2027
Review
Zenobe Energy submits BSC Modification P522 to introduce subsidy-adjusted Shadow Bid Price for Balancing Mechanism transparency
Balancing · REAL-TIME United Kingdom Balancing Mechanism Units (BMUs), Subsidised generators +3
11 Feb 2027
Review
BSC Modification P462: GB industry Workgroup advances proposal to strip subsidy distortion from Balancing Mechanism Bid Prices via BSC Section T amendment
Balancing · REAL-TIME United Kingdom Balancing Mechanism Participants, NGESO (System Operator) +3
28 Feb 2027
Implementation deadline
PJM Confirms RBP Suspension, Elaborates on FERC's Conditional Acceptance and Eligibility Scope
Capacity · FORWARD PJM, United States new generation/capacity resource developers, large load customers +3
March 2027
1 Mar 2027
Implementation deadline
CRE issues companion favorable opinion (Deliberation 2026-177) detailing acompte invoicing calendar for France's capacity-mechanism cost-allocation tax
Capacity · N/A France RTE, Enedis +2
1 Mar 2027
Go-live
CRE grants Enedis a 4-year regulatory sandbox derogation to test DC low-voltage network tariffs (TURPE) at Douai pilot site
Flexibility · N/A France Enedis, Douaisis Agglo +5
11 Mar 2027
Review
BSC Modification P493 advances through Workgroup assessment to improve Transmission Loss Factor transparency and forecasting
Balancing · N/A United Kingdom Generators, Suppliers +3
23 Mar 2027
Consultation deadline
BSC Modification P462: Removal of CfD/RO Subsidy Distortion from Balancing Mechanism Bid Prices Advances Through Assessment Procedure
Balancing · REAL-TIME United Kingdom BSC Parties, Balancing Mechanism Units +4
23 Mar 2027
Consultation deadline
Elexon confirms P462 Workgroup meeting 18 held and full Assessment Procedure timetable through May 2027 unchanged
Balancing · REAL-TIME United Kingdom National Grid ESO (Proposer), Generators receiving CfD support +4
23 Mar 2027
Consultation deadline
BSC Modification P522 Proposes Subsidy-Adjusted Shadow Bid Price for GB Balancing Mechanism Transparency
Balancing · REAL-TIME United Kingdom BMU operators/generators receiving subsidies, NESO (system operator) +3
23 Mar 2027
Consultation deadline
P462 Adds CEPA Cost-Benefit Analysis Phase-Two Addendum, Timetable Still Unchanged Ahead of November-December 2026 Consultation
Balancing · REAL-TIME United Kingdom CfD-supported generators, RO-supported generators +6
23 Mar 2027
Consultation deadline
Zenobe Energy submits BSC Modification P522 to introduce subsidy-adjusted Shadow Bid Price for Balancing Mechanism transparency
Balancing · REAL-TIME United Kingdom Balancing Mechanism Units (BMUs), Subsidised generators +3
23 Mar 2027
Consultation deadline
BSC Modification P462: GB industry Workgroup advances proposal to strip subsidy distortion from Balancing Mechanism Bid Prices via BSC Section T amendment
Balancing · REAL-TIME United Kingdom Balancing Mechanism Participants, NGESO (System Operator) +3
April 2027
1 Apr 2027
Implementation deadline
NESO proposes CMP457 to overhaul ORPS reactive power compensation methodology under CUSC
Balancing · REAL-TIME United Kingdom Transmission-connected Generators, Transmission Owners (TOs) +3
May 2027
1 May 2027
Milestone
SPP Market Monitor Flags Ramp, Pricing and Resource Adequacy Deficiencies After Three West BAA EEA Events
Balancing · MULTI-TIMEFRAME SPP Generation owners in West BAA, Load serving entities in West BAA +5
8 May 2027
Review
P412 Workgroup Meeting 7 Confirmed Held on 29 October 2026; All Downstream Dates Still TBC
Balancing · REAL-TIME United Kingdom Non-BM Balancing Services Providers, National Grid ESO +2
13 May 2027
Regulatory decision
BSC Modification P462: Removal of CfD/RO Subsidy Distortion from Balancing Mechanism Bid Prices Advances Through Assessment Procedure
Balancing · REAL-TIME United Kingdom BSC Parties, Balancing Mechanism Units +4
13 May 2027
Review
Elexon confirms P462 Workgroup meeting 18 held and full Assessment Procedure timetable through May 2027 unchanged
Balancing · REAL-TIME United Kingdom National Grid ESO (Proposer), Generators receiving CfD support +4
13 May 2027
Review
BSC Modification P522 Proposes Subsidy-Adjusted Shadow Bid Price for GB Balancing Mechanism Transparency
Balancing · REAL-TIME United Kingdom BMU operators/generators receiving subsidies, NESO (system operator) +3
13 May 2027
Regulatory decision
BSC Modification P522 Proposes Subsidy-Adjusted Shadow Bid Price for GB Balancing Mechanism Transparency
Balancing · REAL-TIME United Kingdom BMU operators/generators receiving subsidies, NESO (system operator) +3
13 May 2027
Regulatory decision
P502 Assessment Procedure Consultation Slips Four Months to January 2027 (TBC), Delaying GB Supplier-Aggregator Compensation Timeline
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
13 May 2027
Review
P462 Adds CEPA Cost-Benefit Analysis Phase-Two Addendum, Timetable Still Unchanged Ahead of November-December 2026 Consultation
Balancing · REAL-TIME United Kingdom CfD-supported generators, RO-supported generators +6
13 May 2027
Review
BSC Modification P493 advances through Workgroup assessment to improve Transmission Loss Factor transparency and forecasting
Balancing · N/A United Kingdom Generators, Suppliers +3
13 May 2027
Review
Zenobe Energy submits BSC Modification P522 to introduce subsidy-adjusted Shadow Bid Price for Balancing Mechanism transparency
Balancing · REAL-TIME United Kingdom Balancing Mechanism Units (BMUs), Subsidised generators +3
13 May 2027
Regulatory decision
Zenobe Energy submits BSC Modification P522 to introduce subsidy-adjusted Shadow Bid Price for Balancing Mechanism transparency
Balancing · REAL-TIME United Kingdom Balancing Mechanism Units (BMUs), Subsidised generators +3
13 May 2027
Review
BSC Modification P462: GB industry Workgroup advances proposal to strip subsidy distortion from Balancing Mechanism Bid Prices via BSC Section T amendment
Balancing · REAL-TIME United Kingdom Balancing Mechanism Participants, NGESO (System Operator) +3
13 May 2027
Milestone
P502 Timetable Firms Up: Elexon Specifies January 2027 Assessment Procedure Consultation Window
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
17 May 2027
Regulatory decision
BSC Modification P462: Removal of CfD/RO Subsidy Distortion from Balancing Mechanism Bid Prices Advances Through Assessment Procedure
Balancing · REAL-TIME United Kingdom BSC Parties, Balancing Mechanism Units +4
17 May 2027
Regulatory decision
Elexon confirms P462 Workgroup meeting 18 held and full Assessment Procedure timetable through May 2027 unchanged
Balancing · REAL-TIME United Kingdom National Grid ESO (Proposer), Generators receiving CfD support +4
17 May 2027
Regulatory decision
P462 Adds CEPA Cost-Benefit Analysis Phase-Two Addendum, Timetable Still Unchanged Ahead of November-December 2026 Consultation
Balancing · REAL-TIME United Kingdom CfD-supported generators, RO-supported generators +6
17 May 2027
Regulatory decision
BSC Modification P493 advances through Workgroup assessment to improve Transmission Loss Factor transparency and forecasting
Balancing · N/A United Kingdom Generators, Suppliers +3
17 May 2027
Regulatory decision
BSC Modification P462: GB industry Workgroup advances proposal to strip subsidy distortion from Balancing Mechanism Bid Prices via BSC Section T amendment
Balancing · REAL-TIME United Kingdom Balancing Mechanism Participants, NGESO (System Operator) +3
June 2027
12 Jun 2027
Consultation deadline
P412 Workgroup Meeting 7 Confirmed Held on 29 October 2026; All Downstream Dates Still TBC
Balancing · REAL-TIME United Kingdom Non-BM Balancing Services Providers, National Grid ESO +2
18 Jun 2027
Consultation deadline
P502 Assessment Procedure Consultation Slips Four Months to January 2027 (TBC), Delaying GB Supplier-Aggregator Compensation Timeline
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
18 Jun 2027
Consultation deadline
P502 Timetable Firms Up: Elexon Specifies January 2027 Assessment Procedure Consultation Window
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
July 2027
8 Jul 2027
Review
P502 Assessment Procedure Consultation Slips Four Months to January 2027 (TBC), Delaying GB Supplier-Aggregator Compensation Timeline
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
8 Jul 2027
Milestone
P502 Timetable Firms Up: Elexon Specifies January 2027 Assessment Procedure Consultation Window
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
10 Jul 2027
Review
P412 Workgroup Meeting 7 Confirmed Held on 29 October 2026; All Downstream Dates Still TBC
Balancing · REAL-TIME United Kingdom Non-BM Balancing Services Providers, National Grid ESO +2
14 Jul 2027
Milestone
P412 Workgroup Meeting 7 Confirmed Held on 29 October 2026; All Downstream Dates Still TBC
Balancing · REAL-TIME United Kingdom Non-BM Balancing Services Providers, National Grid ESO +2
19 Jul 2027
Regulatory decision
P502 Assessment Procedure Consultation Slips Four Months to January 2027 (TBC), Delaying GB Supplier-Aggregator Compensation Timeline
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
19 Jul 2027
Regulatory decision
P502 Timetable Firms Up: Elexon Specifies January 2027 Assessment Procedure Consultation Window
Balancing · REAL-TIME United Kingdom Suppliers, Independent Aggregators +2
September 2027
30 Sept 2027
Implementation deadline
Ofgem extends NESO's C1.17 derogation on NTC restrictions to 2030, mandates fresh reviews of NTC Calculation Policy and Commercial Compensation Methodology by 2027
Energy · MULTI-TIMEFRAME United Kingdom NESO, Ofgem +3
October 2027
13 Oct 2027
Auction
Commission publishes revised 2026 and 2027 EU ETS1 auction calendars with 190.5 million allowances entering the MSR
Carbon · MULTI-TIMEFRAME Ireland, United Kingdom, Europe-wide / cross-border Power generators, Industrial installations +6
November 2027
1 Nov 2027
Go-live
CRE orders RTE to align Tempo red-day selection with capacity mechanism's Peak Period algorithm
Flexibility · N/A France RTE, EDF +4
1 Nov 2027
Implementation deadline
CRE approves RTE's revised NEBCO market rules: new capacity-mechanism-linked payment formulas, extended panel-method learning period, delayed ELD rollout, and temporary reliability-indicator derogation
Flexibility · N/A France RTE, CRE +6
1 Nov 2027
Go-live
CREG validates Elia's Y-1 capacity auction results for Belgium's 2027-2028 CRM delivery period